The dates have been chosen. Same scenario as last year, but there will be some changes in route and lodging. I'll keep you posted here and here---------------------->CLICK
6/28/11
2012 ozark mountain scramble
6/13/11
ozark mountain scramble 2011 : done
What do you say after a journey like this? I mean, there are so many things to sum up over 3 days and 600 miles of riding, it is hard to put into words.
First and foremost I would like to thank everyone that made the run what it was/is. I know I couldn't be any happier with the way things went, and only plan to tweak a few things for next years ride. For the most part repairs were at a minimum. My bike seemed to be the most erratic in behavior, but nothing a handful of spark plugs, a couple fuses, and a ton of oil couldn't fix. Five riders in total had the gusto to join, and despite the low numbers the fun meter never dwindled. All riders but one fit all three criteria, but considering he became our Unofficial Road Captain and fit two of the three rules there is no reason to gripe. Good times had by all. See you next year!
6/7/11
6/1/11
5/19/11
cb450 build/entry : part 12
5/18/11
cb360-2 build/entry : part 1
Just thought I should let you know I am still in the game. I had been swamped with work for a while. The basket-case CB350 was just not going to make it. My friend Brad found a '76 Honda CB360 for cheap, and talked me into buying it, and starting over with a running bike. Of course I immediately had to make some changes. I put on a CB500T tank. It has the style I wanted, and has about twice the capacity as the 360 tank. The 500 tank was badly dented. Long story; my fancy pin-welder-dent-puller idea went south, when I popped a hole in the tank, on the first yank. Brad was a big help in welding that for me. Last weekend, I layed-down some mud and then some candy-apple red.
The seat and rear fender didn't turn out like I wanted, but it will do for now. I think I'm going to like the rear-set shifter. I hooked up the fuel-lines (no leaks) and it started on the second kick. Still have some work to do, but it's do-able. Your post reminded me I need to get the tags and insurance. I should be ready to ride soon.
Rand Man
5/17/11
ozark mountain scramble
Just a couple weeks before the OMS kicks off! I've got a couple loose ends on the kz400 to take care of, but nothing that can't be done in an afternoon. It's going to be a real humdinger! Also, don't forget to check out ozarkmountainscrable.blogspot.com for any further info needed.
4/29/11
cb360 build/entry : part 2
Frame and tank have been painted and reassembly has begun. Parts have been coming in at a steady pace with a few hiccups along the way. Hopefully we can wire and fire it this weekend to hear it run for the first time. I made up a kick only wiring diagram that is untested at the moment. We'll know if something explodes soon enough. Here's some crappy pics to prove all of the above.
4/21/11
kz400 build/entry : part 16
Took the bike on it's maiden voyage last night at around 10pm with no front brakes and dodgy rear brakes at best. Considering it hasn't been jetted outside of the stock cr125 settings, it ran rather well. Still running rich, but nothing that can't be sorted with some tinkering. Also whipped up a more current wiring diagram that may be of use for others out there with a kick only setup.
4/20/11
kz400 build/entry : part 15
Wiring is on the verge of being finished, just lack a brake light switch to consider it done. Installed some new stainless allen head case cover bolts, so good riddance to the old phillips head shite. The last of the main checklist include seat mounts, install fork seals, brake pads front/rear, and tuning the carb. Not far off at all now.